Case Studies

DATACENTRE.ME works with a number of data centre businesses who release case studies on a regular basis.  

Please note that DATACENTRE.ME takes no responsibility for the content contained in these documents.


 

Glide Business C-Type Mini Cabinet:  As one of the UK’s fastest growing providers of high-speed Internet to business parks, industrial estates, and metropolitan and rural areas, Glide Business uses state-of-the-art cabinet solutions from Cannon Technologies to keep vital equipment protected and secure.  Read full case study here.

 


GO Outdoors, the UKs largest outdoor store has awarded EcoCooling the contract for the installation of evaporative cooling equipment across multiple stores.  Read full case study here.

Click here for a link to more EcoCooling case studies.


Fujitsu selects Starline Track Busway as Power Distribution System for Data Centre Expansion Project:  In order to meet customer requirements, Fujitsu needed to build an extension onto a 3.2 megawatt data centre it manages just north of London. Read full case study here.

Click here for a link to more Starline case studies.


IP House deploys Schneider Electric’s EcoStruxure:  How The IoT and Big Data Are Driving Holistic Data Centre Services For London’s Playmakers.  Read full case study here.

Schneider Electric and Interxion partner to deliver new Dublin data centre:  Interxion needed to deploy the most energy efficient components in their data centres. Partnering with Schneider Electric enabled Interxion to be at the forefront of energy efficient technology.   An excerpt from the case study detailed above can viewed in a detailed video by clicking here.  Read full case study here

Angel Trains Data Centre :  Schneider Electric critical infrastructure ensures Angel Trains Data Centre stays on track.  Read full Schneider Electric case study

Kelvin Hughes Case Study:  Deployment of  Schneider Electric StruxureOn for 24/7 monitoring of data centre applications. The application forms part of Schneider Electric’s EcoStruxure ™solution for data centres.  Read the full Schneider Electric case study

Click here for a link to more Schneider Electric case studies.


Arcinova UPS replacement:  Power Control Ltd has carried out a complete UPS replacement for a leading global provider of pharmaceutical contract research and development, Arcinova.  Read full case study here.

Click here for a link to more Power Control case studies.


Power after a lightening strike:  Aggreko assisted a Chicago based casino following a lightning strike which destroyed its transformer and left the casino completely cut off from electricity. The 53,000 square ft. casino was located on a floating barge, making the conditions for repair even more challenging. Read full case study here.

Click here for a link to more Aggreko case studies.


Click here for a selection of Joyce Solutions case studies from recent and past projects.


Click here for link to Stulz case studies.


Hafele Case Study :   Häfele UK made the decision to invest in Riello UPS technology, through reseller Computer Power Protection. A bespoke solution was required that would ensure reliable, continuous power to keep Häfele delivering the highly efficient service it is known for. Read the full Riello UPS case Study

Protecting EIR Ireland's Telecoms Infrastructure:  When eir, Ireland’s largest telecommunications operator (formerly eircom) embarked on a project to repurpose existing space into a brand new data centre to support its current and future business enterprise, resiliency was a key factor.  Read the full Riello UPS case study

 


Click here for a link to NTT Communications case studies.

 


Click here for a link to Sunspeed case studies.


Data Center UMCG: FlaktGroup provided an Energy efficient solution for datacenter of one of the largest hospitals in the Netherlands  Read full case study

Precision Cooling Upgrade for Archive Store - A well known data and records storage company needed to refurbish the controlled cooling system one of their existing facilities by delivering conditioned air through an existing ducted area.  Read Full case study

__________________________________________________________________________________________________

Click here for a link to Excel case studies.

 


Click here for a link to Uniflair case studies.


Click here for a link to Gamatronic case studies.


Click here for a link to Vertiv case studies. 


Click here for a link to Hygood case studies.

 


If you are interested in having your organisation's case studies published on this page, please contact Caroline Hitchins on +44 (0) 7544 121900 / caroline@datacentre.me 

 

 

telecommunications operator
(formerly eircom) embarked on
a project to repurpose existing
space into a brand new data
centre to support its current
and future business enterprise,
resiliency was a key factor
estate. The project was awarded to and led by leading data centre specialists Keysource, who were chosen 
in partnership with Schneider Electric. StruxureWare for Data Centers DCIM platform was chosen to deliver 
a range of operational, performance, cost and efficiency benefits across Sky’s business

If you are interested in having your organisation's case studies published on this page, please contact us as follows:  +44 (0) 7544 121900 / caroline@datacentre.me

estate. The project was awarded to and led by leading data centre specialists Keysource, who were chosen 
in partnership with Schneider Electric. StruxureWare for Data Centers DCIM platform was chosen to deliver 
a range of operational, performance, cost and efficiency benefits across Sky’s business

If you are interested in having your organisation's case studies published on this page, please contact us as follows:  +44 (0) 7544 121900 / caroline@datacentre.me